The 300-hp boiler at Longview Fibre Paper & Packaging in California did not meet the district's air quality requirement of <9 ppm NOx. Replacing the boiler with the CBEX firetube met the emissions requirement, increased efficiency and reduced operating costs.

Featured Webinar

{{ 'Improvements Through Boiler Plant Optimization' | limitTo: 50 }}

Facility optimization begins with a comprehensive review of boiler room equipment with respect to the four cornerstones of Boiler Plant Optimization: Safety, Efficiency, Reliability and Sustainability. Webinar attendees will learn methodologies to uncover opportunities in these areas to achieve operational goals.

Featured Article

Industry 4.0 continues to sweep through industry, constantly penetrating and changing new areas of plant operations. That change has finally come to the boiler room. Cleaver-Brooks has launched its Prometha® IoT-connected boiler solution, which provides actionable insights into your boiler operation.